Azerbaijan
Railway line Baku-Böyük-Kesik
Electrification of 502 km of lines
The project consists in the 25 KV 50 HZ electrification of 502 km of lines initially supplied with direct current (3.3 kV) between Baku, on the Caspian Sea and Boyuk-Kesik, on the Georgian border.
In addition to the installation of a new electrification system (conversion of direct current into alternating current), the project also consists in:
- replacing and upgrading the signaling systems (with modern Electronic Interlocking systems, ATP system, new Centralized Traffic Control in a 2nd phase),
- supplying 40 AC Freight Electric Locomotives and 10 AC/DC Passenger Electric Locomotives.
Our mission(s)
- Technical inspection services
- Project management