Belgium
Tubize
New bridge over the Senne - Tubize
- Country
-
Belgium
- City
-
Tubize
- Status
-
- Realised
- Years and Phases
-
- Studies : 2012
Works : 2017 - 2018
- Studies : 2012
- Capabilities
- Services
- Project type
-
- New
- Client
-
- Municipality of Tubize
The project aims to replace the old bridge over the Senne with a new one that is approximately 20 meters long and to repair the banks on the former Fabelta-Sud industrial site in Tubize. This initiative is part of the measures being taken to prevent flooding.
Our mission(s)
TPF Engineering was involved in this project as an engineering firm specializing in structural engineering and architecture. Our tasks included developing the preliminary and final project designs, creating the tender documentation, and providing support in preparing the permit files.