Ghana
Navrongo

Navrongo Water Treatment plant

Year
  • 2020
Country
Ghana
City
Navrongo
Status
  • Realised
Capabilities
Client
  • Republic of Ghana
Partners
  • Denys Engineers & Contractors BV
Sustainable development goals
Clean Water and Sanitation Sustainable Cities and Communities

New water treatment plant aimed at improving water supply in and around Navrongo

The project involved the design and construction of:

  • the treatment plant  (20,500 m³/day),
  • two new elevated water reservoirs (600 m³ and 400 m³),
  • three buildings, including one for the General Services, 
  • a building housing the reception (20x20m),
  • a high-lift pump station with underground reservoir, 
  • a foundation slab for the Chemical Waste Treatment Plant,
  • an intermediate pumping station (70 m³/h),
  • a chemical building. 

 

Our mission(s)

Structural engineering services:

  • formwork drawings (concrete structures) based on the process plans,
  • reinforcement drawings (reinforced concrete structures),
  • quantity survey related to the formwork drawings (cubi meters of concrete and formwork),
  • steel list,
  • list of plans.