Centralized management of the Madrid Calle 30 tunnels
Madrid's M-30 tunnels form an underground infrastructure complex approximately 48 km in length, through which more than 500,000 vehicles circulate daily
TPF has carried out the supervision and coordination of the comprehensive renovation, covering both the hardware and software of the Control Centre, as well as the new ventilation control algorithms.
The complexity and difficulty of the work lies in maintaining all systems operational and ensuring 100% track availability during peak hours while the control system is completely replaced. This involves working simultaneously with the existing and new control systems, migrating the different subsystems one by one and carefully, managing risk to minimize the potential for failure at all times
Our mission(s)
Supervision and control of the renewal of the equipment, installation, programming, configuration and commissioning of the three levels of the Madrid Calle 30 tunnel control system